Friday, September 26, 2008

New kitchen floor - Part I


Paul and Leslie called around 6pm, wanting to know if I wanted to get started early on the floor in the kitchen. I said, of course, and we listened to the debate while we started prepping the kitchen. The first task was dislodging the four thresholds (basement, hallway, dining room, mudroom). Three came out relatively easily but the last one, leading to the mudroom, was a bit different. This required actually cutting off a piece of it as it was originally the threshold leading outside to the back porch. I don't know what we'll have to do with that but that will be at some point later.
Then it was removing baseboards and undercutting the door casings. I was happy to use my newly purhcased jamb saw - which is totally awesome, by the way - and then Paul came in with a chisel to get out the rest.
With moving the appliances, it took about 3 hours to do those few things. I'm going to get up at the butt-crack of dawn tomorrow to run to HD. I was told, by the HD people, to buy vapor barrier even though this is an above-grade installation. Paul recommends (as do the directions) to just use polyethylene underlayment so I will be getting some of dat instead. Paul will be here bright-eyed-and-bushy-tailed at 7am. I hope we can nail out this puppy in a few hours - I'm trying not be overly optimistic though; as I should know by now, it never is as easy as it seems.
I'll show you what I can when it's done! Say goodbye, ugly, asbestos-laden vinyl!

1 comment:

Tracy said...

Good-bye old floor! Wow, what an exciting day! I can't wait to see how it all works out. I'll be thinking of you all lots today, hoping it goes well!