Services/fees
$217.52 Electrical contractor to run new 220 and new breaker
$125.00 Exterminator to treat and remove huge hornets nest
$154.10 Plumber for two trips - one to fix shut-off valve to house, one to wait for city to arrive
$26.60 Waste materials to dump
Tile and tile materials
$362.18 including white subway tile and trim tile, floor tile, mastic, grout, Schluter Ditra
Miscellaneous building materials
$56.89 for new studs, joint compound, plywood subfloor
Trim and molding
$110.47
Plumbing materials and supplies
$208.00 Bathtub/shower and sink faucets
$95.54 miscellaneous extenders, supply lines, etc.
Big stuff
$158.00 Toilet
$288.00 Vanity/sink
$76.95 Beadboard
$98.00 Lights
$575.00 Tub refinish
Total bathroom renovation costs $2617.25
Overall, I feel pretty good about the costs of the renovation. I was hoping to stick close to $2,000 and I would have been there if it hadn't been for some of the unexpected expenses, which I should honestly expect. Anyway, I think that it was worth it. You can judge for yourself, of course:
Before
After
After again (just because I love this tile and refinished tub so much)
1 comment:
Beautiful. Great work.
Post a Comment